Flow to request
Until now, it was thought that concrete tanks that had deteriorated over time could not be repaired.
We offer proposals to extend the life of aquariums
Please feel free to contact us
Free
Please let us know what kind of trouble you are having by hearing.
《Inquiries》
Symptoms (cracks, water leakage, deterioration over time), building age, environment, etc.
Please contact us
Structure survey
2.
We will collect samples on-site and submit a test-report during the official period.
Cores (concrete blocks) were collected from several locations.
Compressive strength/neutralization tests are conducted at public institutions.
Based on the results, we prepare and submit a report.
《Estimated cost》
Transportation expenses to the site, accommodation expenses, research expenses, test expenses...
(Please contact us as it depends on the situation)
Click here for details Concrete frame survey
·Consultation is free
・ Briefing session (free) is also possible
・Structure survey ・We will explain the main construction, period, estimate, etc.
Consultation after structural survey
Free
We will do our best to carry out construction work that does not interfere with business operations.
If there are multiple locations and multiple units, there are cases where construction is performed several times or over several years.
Please consider whether to carry out construction based on the results of the frame survey.
A briefing session (free) is also possible, so please feel free to contact us.
Submission of repair plan, estimate
Free
To main construction
After consultation ~ Quotation
One construction takes about 1-2 months in most cases. (depending on area)
In order not to interfere with business, we are careful about dust and other factors during construction.
Since it is not a long-term construction, there is no need to stop operations or perform large-scale relocation work for rebuilding.
Example: inner wall construction
▼
Click here for details Water tank inner wall (anti-corrosion)
·Consultation is free
・ Briefing session (free) is also possible
・Structure survey ・We will explain the main construction, period, estimate, etc.
Example: Exterior wall construction
▼
Click here for details Tank outer wall
·Consultation is free
・ Briefing session (free) is also possible
・Structure survey ・We will explain the main construction, period, estimate, etc.